Our Premium Packages
Package Cost – Rs.2400/sq
Edit Content
- Structual Steel – JSW, ARS, i Steel
- Bricks – Wire Cut Chamber Burnt Bricks
- Cement – Dalmia, Ramco or Ultra Tech or equivalent 53 grade
- Ceiling Height – 12 feet (Finished Floor level to finished roof or ceiling level)
Edit Content
- Living, Foyer, Kitchen, Dining & Bedrooms : 6’x3′ Vitrified tiles – Rs.130/- per Sqft
- Staircase : Granite – Rs.150/- per Sqft
- Balcony & Sit-out : Anti-skid tiles – Rs.90/- per Sqft
- Parking Area : Parking tiles – Rs.55/- per Sqft
Edit Content
- Kitchen counter top : Granite – Rs.150/- per Sqft
- Kitchen Wall Dado (Up to 2’ above counter) : Back splash tiles – Rs.55/- per Sqft
Edit Content
- Toilet Flooring : Anti-skid tiles – Rs.65/- per Sqft
- Toilet Wall tiles (7ft height) : Highlighting Tiles – Rs.65/- per Sqft
Edit Content
- Main Door : Teak Wood frame & shutter including hardware – Rs.50,000/- per door
- Internal Doors : Sal wood frame & shutter including cost of hardware – Rs.12,500/- per door
- Windows – Aluminium Windows with glass shutters and mesh shutters(3 track with 1 mesh)
- Main Door – Planing, rebating and Varnishing Internal Door frames & shutters – Paint
- Bathroom Door – UPVC Frame & shutter including hardware – Rs.12,500/- per door
- Door hardware – Hafele, Godrej make.
- UPVC windows – 6mm clear glass – Rs.650/- per Sqft.
- Wooden windows – Sal wood Frame (5”x3”) & Honne Shutter (1.5” thickness) with clear glass and grill rods – Rs.750/- per Sqft
Edit Content
- Main Gate : MS Gate – Rs. 480/- per Sqft
- External staircase & balcony railing : MS Railing – Rs. 260/- per Sqft
- Internal staircase railing : SS Railing – Rs.260/- per Sqft
- Window MS Grills – Rs.250/- per Sqft
Edit Content
- Internal wall & ceiling : Wall putty + primer coat + ‘Royale’ paint (Asian/Berger/Dulux).
- External walls : Primer coat + external Apex Ultima (Asian/Berger/Dulux).
Edit Content
- Internal and External Light & power points – as per electrical design
- Geyser points – All bathrooms
- AC points – Bedrooms and Halls
- Conduits – Good quality, concealed lines
- Wire – Orbit or Finolex or Polycab – FRLS
- Copper Earthing
- Switches & Plates – Anchor-Roma, Legrand, GM make
- A main DB & MCB – Siemens/L&T/Havells Equivalent make
Edit Content
- Internal & External Water supply system
- External sewage system – Inspection chambers & sewage outlet to site boundary
- Concealed lines CPVC pipes – Ashirvad/Astral
- Geyser Provision
- PVC Overhead Tank – Aquatech, Supreme or Equivalent make
Edit Content
- Kitchen sink : SS/Carysil – Rs. 15,000/- per sink
- Kitchen sink accessories – Rs. 8,000/-
- CP & Sanitary fixtures such as Wash Basin, WC, Taps and other accessories like bottle trap, gratings etc. : Jaquar/Parryware – Rs.50,000/- per bathroom attached toilet and Rs.10,000/- per powder room
Edit Content
- Weathering Coarse + Chemical Waterproofing
Edit Content
- A design if needed to be modified more than thrice shall be charged for accordingly
- Government fees for the liaison bodies to be paid directly by the client
- The complete fee payment for plan sanction in Panchayat limits need to be borne by client
- Assuming the site & road level to be equal, if the ground level needs to be raised above 45cm , it shall be charged for accordingly
- Hard rock/soft rock excavation, if it arises shall be charged for accordingly
- Buying new earth/sending existing earth for excavation/backfilling purpose shall be charged on actual
- Percentage of opening for doors & windows – 22% of built up area Maximum
- Any work not mentioned within this package or outside the site boundary shall be charged for accordingly
- One point of Electricity & water needs to be provided by the client free of cost to facilitate construction
- SBC of soil is considered at 180 KN/M2 and depth of the foundation considered at 5 Feet. Any increase in depth shall be charged accordingly on actuals upon site conditions
- If there is constraints in material delivery or socking place and materials to be order in small quantities. The additional charges for the same shall be charged on actuals
- Any road cutting charges for the connection of Electricity and Sewage lines is not included. Such works shall be charged additionally
- NOTE: The above mentioned material specifications are generalized, the inclusion or the exclusion of the same shall vary depending on the floor plan.